Asbestos removal and new sandwich-panel roof with steel structure, carried out by AV Metal at Cerexport in Aveiro, Portugal.

Project description

At Cerexport, in Aveiro, AV Metal removed the asbestos roof and installed a new sandwich-panel roof, including the full supporting structure, flashing, gutters and downpipes.

Besides the roof, the project included a steel walkway, stairs and guardrails — an example of combining asbestos removal, roofing and steel structures with a single contractor.

The photos show the asbestos decontamination unit set up on site, the steel structure of the hall, structure and panel material on site, and the walkway with stairs and guardrails.

Works carried out on this project

  • Removal of the existing asbestos roof
  • New sandwich-panel roof and supporting structure
  • Flashing, gutters and downpipes
  • Steel walkway, stairs and guardrails

Project photos

Asbestos decontamination unit — Cerexport, Aveiro
Asbestos decontamination unit
Steel structure of the hall — Cerexport, Aveiro
Steel structure of the hall
Steel structure of the hall — Cerexport, Aveiro
Steel structure of the hall
Sandwich panels ready to install — Cerexport, Aveiro
Sandwich panels ready to install
Steel walkway, stairs and guardrails — Cerexport, Aveiro
Steel walkway, stairs and guardrails
Steel walkway, stairs and guardrails — Cerexport, Aveiro
Steel walkway, stairs and guardrails
Steel walkway, stairs and guardrails — Cerexport, Aveiro
Steel walkway, stairs and guardrails

Works carried out